Bathroom Renovation Walnut Close
Index Page
Previous Page


I came to this job after the original bathroom had been stripped. We retiled the floor and walls, installed an electric shower and shower cubicle and rejigged the water supplies before installing the WC and basin.

Shower base, shower and floor tiles

Heated towel rail and tiling

Shower showing tiling etc

View from the doorway
Next Page
Previous Page
Index Page
IHome
Back to Clients
AAA Web Album Software & Logos