Bathroom Renovation Valley Drive
Index Page
Previous Page
This Victorian-style bathroom was dark and in need of repair. When the tiles were removed most of the plaster came away.
Before it was gutted the window was replaced and it was then rewired for lighting and an electric shower. It was replastered
completely and the old lead pipework replaced. It was than retiled, both the floor and the walls up to the ceiling and the new
suite installed.

Before from doorway


Oribinal window, basin, WC cistern

Original bath, tiling and wallpaper

Stripped & replastered. The plaster is still drying out before tiling


Drying plaster where the bath and shower will be

After from doorway

New window & reveal

Shower, screen & tiling detail
Next Page
Previous Page
Index Page